Commit Graph

8 Commits

Author SHA1 Message Date
Andre Nathan c8a617cfcb
Add per-project and per-swimlane task limits
This change allows projects and swimlanes to be configured with task limits that apply to their whole scope (i.e. all active tasks in a project or swimlane, respectively), as opposed to the usual per-column task limits.
2020-02-25 20:26:31 -08:00
Andre Nathan e59ab08af3 Allow task limits to be applied per-swimlane 2020-02-04 20:16:35 -08:00
Frederic Guillot ad8b1223cc Check owner existence before to create project 2017-05-27 12:18:05 -04:00
Frederic Guillot 3cf9484644 Ensure project tags are removed when the project is removed (PR #3250) 2017-05-12 16:26:11 -04:00
Frederic Guillot b27a7db354 Do not list private projects when adding a new user 2017-03-19 17:05:28 -04:00
Frederic Guillot d5c4c18ea0 Add email address field for projects 2017-02-04 16:03:29 -05:00
Frederic Guillot 3861e90336
Fix wrong project date format (shown as 01/01/1970) 2016-08-31 21:04:22 -04:00
Frederic Guillot 10d577ad9d
Handle priority for task and project duplication 2016-07-02 16:36:10 -04:00